Hi Experts,
We are have Pension contribution plan in 0169 where wage type 9XXX that takes in total hours from /229 via custom PCR. . Then the hours are multiplied by a constant stored in table T511K. The problem is that suppose we have created a record for hours in IT 2010 for some previous period during the current run and want to reflect that change with the a retro run. i.e 97XX should take in hours from /229 in the current period plus those additional hours give in some previous period and reflect the same in the current period. And this not happening.
E.g. In for period 04 say, we want the hours also that have in given additionally for in period 02. We have checked tables V_51P6_B as well as V_51P6_C for 9XXX and it's OK.
Are we missing something here?