Hi Team,
We are transferring our HR Master data's from one system to another system through IDOCS, our master data's are being transferred to another system,
We have an issue with source system and destination system.
in Source system all the data's were correct
Like employee was hired on 02.05.2013 and position action done 16.11.2013 and another position action done 01.01.2014, so data's in Source system is like below in IT0000
02.05.2013 to 15.11.2013 - Hring
16.11.2013 to 31.12.2013 - Position grade
01.01.2014 to 31.12.9999- Position grade - which is correct ,
After data's were passed through IDOC to destination system and has like this
02.05.2013 to 31.12.9999 - hring
16.11.2013 to 31.12.2013 -position grade
01.01.2014 to 31.12.9999- which is wrong two records have end date 31.12.999, since Values are coming from IDOCS, this has been saved in the IT0000 which causes the problems in the destination system currently.
What are the possible cause for these type of issue when comes through IDOC, i have checked time constraint it has as same as source system. need possible causes for these issues.